 |
Tailings Co-Disposal
in Waste Rock
Feasibility Study - Geotechnical Performance
|
|
| |
|
|
| |
 |
Design of mult-phase laboratory program to evaluate
performance of co-disposal system in terms of
stability and permeability |
 |
Coordinated program with environmental laboratory
program to predict leachate quality, ARD potential,
and optimize system design for costs, geotechnical
and environmental performance |
 |
Simulated mixes and blends for dynamic testing
in ARD program using humidity cells |
 |
Trade-off study for alternative binders and
blending ratios |
|
|
| |
|
|
|
Argentina
(2002-2003) |
|
| Client: |
|
Meridian Gold Co. |
| |
|
|
|
|
|
|
| |
| |
|
|